Material Requirements Planning POM

Get perfect grades by consistently using our affordable writing services. Place your order and get a quality paper today. Take advantage of our current 20% discount by using the coupon code GET20


Order a Similar Paper Order a Different Paper

Material Requirements Planning POM

The assignment is listed below along with required guidelines.

There are 2 questions to be answered.

The write up should be in 12 font APA format for the written part of the assignment. The calculations should be in Word but also the calculations should be either spelled out in the Word document for all questions and if Excel used to calculate the excel spreadsheets should be provided as well.

Submit correct solutions:

oThe required elements for problem 15-12: (a) correctly calculate the on-hand quantity for each of the eight periods, (b) correctly calculate the order size base on the lot size and production needs, (c) correctly determine when to place the order based on the lag time, and (d) correctly show when the purchased orders will arrive.

oFor problem 15-13: (a) correctly calculate the on-hand quantity for each of the eight periods, (b) correctly calculate the order size base on the lot size and production needs, (c) correctly determine when to place the order based on the lag time, and (d) correctly show when the purchased orders will arrive.

2.Write 1–3 paragraphs that demonstrate your knowledge of the concepts from the assigned reading related to the problem solutions

3.Write 1–3 paragraphs that explain the solution using the concepts from the assigned reading that relate to the solution.

The required elements for problem 15-12: (a) correctly calculate the on-hand quantity for each of the eight periods, (b) correctly calculate the order size base on the lot size and production needs, (c) correctly determine when to place the order based on the lag time, and (d) correctly show when the purchased orders will arrive.

Complete the following MRP matrix for item A:

Item: A

LLC: 1

Period

Lot Size: Mult 50

LT: 2

1

2

3

4

5

6

7

8

Gross Requirements

10

15

25

75

60

85

45

60

Scheduled Receipts

Projected on Hand

50

Net Requirements

Planned Order Receipts

Planned Order Releases

15-13

For problem 15-13: (a) correctly calculate the on-hand quantity for each of the eight periods, (b) correctly calculate the order size base on the lot size and production needs, (c) correctly determine when to place the order based on the lag time, and (d) correctly show when the purchased orders will arrive.

Complete the following MRP matrix for Item X. Determine when orders should be released and the size of those orders.

Item: X

LLC: 0

Period

Lot Size: Min 50

LT: 2

1

2

3

4

5

6

7

8

Gross Requirements

25

30

56

25

100

40

30

20

Scheduled Receipts

50

Projected on Hand

30

Net Requirements

Planned Order Receipts

Planned Order Releases

Have your paper completed by a writing expert today and enjoy posting excellent grades. Place your order in a very easy process. It will take you less than 5 minutes. Click one of the buttons below.


Order a Similar Paper Order a Different Paper