\n 14-2. Using the following data, prepare a run chart, scatter chart, and control chart. \u00a0A late surgery is defined as any surgical operation that was started more than 30 minutes after its scheduled time (Table 14-4).\n <\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"
14-2. Using the following data, prepare a run chart, scatter chart, and control chart. \u00a0A late surgery is defined as any surgical operation that was started more than 30 minutes after its scheduled time (Table 14-4).<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_joinchat":[]},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts\/228224"}],"collection":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/comments?post=228224"}],"version-history":[{"count":0,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts\/228224\/revisions"}],"wp:attachment":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/media?parent=228224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/categories?post=228224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/tags?post=228224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}