<\/p>\n
1. Chapter 7: Question #7 – Page 161 of Operations & Supply Management 14th Ed (2 pts)<\/u><\/p>\n
For each of the following variables,explain the differences (in general) as one moves from a workcenter to an assembly line environment.<\/p>\n
2. Chapter 7: Question #8 – Page 161 of Operations & Supply Management 14th ed (2 pts) ( Reference the example 7.1 on page 152)<\/u> FACILITY LAYOUT PROBLEM<\/strong><\/p>\n <\/strong><\/p>\n ABC Corporation is planning to assemble a lawnmower using an assembly line. The following table provides the job elements and their precedence elements and the element times.<\/p>\n Draw the precedence diagram of this assembly job. (2PTS) ( see page 176-178 of your text book, Exhibit 8.9&8.10).<\/p>\n If the production requirement for the lawnmower is 500 units per 8 hour shift, what will be the speed of this assembly line? (2PTS)<\/p>\n (Line speed = Time allotted per shift in seconds\/no. of units produced per shift)<\/p>\n SERVICE PROBLEMS<\/strong><\/p>\n Chapter 9: Question #1&3 – Page 217 of Operations & Supply Management 14th ed (2 pts) <\/u><\/p>\n Write your responses in a word document. Please show your work. Upload and submit the file via the title link\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":" 1. Chapter 7: Question #7 – Page 161 of Operations & Supply Management 14th Ed (2 pts) For each of the following variables,explain the differences (in general) as one moves from a workcenter to an assembly line environment. a. Throughput time (time to convert raw materials into product) b. Capital\/labor intensity c. Bottlenecks 2. Chapter […]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_joinchat":[]},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts\/264777"}],"collection":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/comments?post=264777"}],"version-history":[{"count":0,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/posts\/264777\/revisions"}],"wp:attachment":[{"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/media?parent=264777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/categories?post=264777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualityassignments.net\/wp-json\/wp\/v2\/tags?post=264777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
A book publisher has fixed costs of $300,000 and variable costs per book of $8.00. The book sells for $23.00 per copy<\/p>\n\n
\n\n
\n ELEMENT<\/td>\n PRECEDENCE ELEMENT<\/td>\n ELEMENT TIME<\/td>\n<\/tr>\n \n A<\/td>\n none<\/td>\n 30 seconds<\/td>\n<\/tr>\n \n B<\/td>\n none<\/td>\n 30 seconds<\/td>\n<\/tr>\n \n C<\/td>\n A<\/td>\n 20 seconds<\/td>\n<\/tr>\n \n D<\/td>\n B<\/td>\n 20 seconds<\/td>\n<\/tr>\n \n E<\/td>\n C,D<\/td>\n 30 seconds<\/td>\n<\/tr>\n \n F<\/td>\n E<\/td>\n 40 seconds<\/td>\n<\/tr>\n \n G<\/td>\n F<\/td>\n 10 seconds<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n \n